Microsoft Office Tutorials and References
In Depth Information
10. Drag the bottom of the Report Header section all the way up to the Report Header
section bar to remove the section from the report. See Figure 7-15.
Figure 7-15
After modifying the rptContract report in Design view
Report Header section removed
report title moved from the
Report Header section
labels moved down
and line added
under them
11. Save your report changes, switch to Print Preview, and then scroll through the
report, ending on the last page of the report. See Figure 7-16.
Figure 7-16
The modified rptContract report in Print Preview
12. Close the report.
13. If you are not continuing on to the next session, close the Panorama database, and
then exit Access.
Now that you have completed the changes to the rptContract report, you’ll create a
custom report for Sarah in the next session.
 
Search JabSto ::




Custom Search